Sie sind hier: Startseite Gender Competence 2003-2010 Gender Mainstreaming Implementation Implementation Concept Evaluation / Controlling

Evaluation / Controlling

Implementation concept – evaluation/ controlling

Good work results require stable steering and support. The implementation of GM as a cross-sectional task is a dynamic process that needs watching. The findings gained should be continuously fed back into the process. So planning for evaluation and monitoring control should therefore also be built into the implementation concept. The experience gathered can then be used to optimize the existing implementation concept.


erstellt von Administrator zuletzt verändert: 02.01.2010 20:07